Assembly Instructions
Tools Required
- Screwdriver (Phillips & flat-head)
- Hammer or rubber mallet
- Drill with bits
- Level
- Measuring tape
- Clamps (optional)
Parts Included
- Side panels (left & right)
- Top & bottom panels
- Back panel
- Doors (pre-drilled for hinges)
- Drawer box parts (if applicable)
- Shelves
- Hardware (screws, dowels, cams, hinges, brackets)
Step-by-Step Assembly Guide
1. Prepare Workspace
- Lay a blanket or cardboard on the floor to avoid scratches.
- Ensure all parts are present and undamaged.
2. Assemble the Box Frame
- Insert wooden dowels into the top and bottom panel edges.
- Attach to side panels using cams and screws.
- Ensure edges are flush and tighten all cam locks.
3. Install the Back Panel
- Slide the back panel into the grooves (if slotted).
- Or screw it directly using pre-drilled holes for structural support.
- Check for squareness before tightening.
4. Mount the Legs or Suspension Rail
- For base cabinets: attach adjustable legs to bottom panel.
- For wall cabinets: screw suspension rail to top interior panel if included.
5. Install Shelves
- Place shelf pegs at desired heights.
- Slide or set in the shelf boards.
6. Attach Hinges to Doors
- Insert and screw in Euro-style hinges (usually 35mm cup pre-drilled).
- Use 2-3 hinges per door depending on height.
7. Mount Doors to Cabinet
- Align and attach hinge plates to the side panels.
- Clip doors onto hinge plates.
- Adjust for alignment (left-right, up-down, in-out).
8. Assemble and Install Drawers (if applicable)
- Assemble drawer boxes (sides, bottom, and back) using cam/dowel system.
- Attach metal drawer slides to cabinet and box.
- Slide drawer into tracks and adjust.
9. Final Adjustments
- Check for door alignment and gaps.
- Use hinge screws for micro-adjustment.
- Tighten all fasteners and ensure stability.
Tips for Best Results
- Always use a level when installing cabinets on walls.
- Screw wall cabinets into studs using appropriate anchors.
- Combine multiple cabinets before mounting for consistent alignment.